5. installing electrode holder and work clamp, Piece – Hobart Welding Products STICKMATE OM-950 User Manual
Page 18
OM-950 Page 14
4-5. Installing Electrode Holder And Work Clamp
Y Turn Off unit and disconnect input
power before installing electrode
holder or work clamp.
Removing Barrel From Electrode Holder
1
Electrode Holder
2
Barrel
3
Access Hole
4
Set Screw
Loosen set screw through access hole and
slide barrel away from electrode holder.
Installing Electrode Cable and Barrel
onto Electrode Holder
5
Electrode Cable From Unit (Has Bare
Conductors on End)
6
Terminal Screw
Back out terminal screw from electrode
holder. Insert electrode cable through barrel
into end of electrode holder and tighten ter-
minal screw securely.
Move barrel toward electrode holder and
tighten set screw to secure barrel in place.
Installing Work Cable onto Work Clamp
7
Work Clamp
8
Work Cable From Unit (Has Ring
Terminal on End)
9
Mounting Bolt
Route work cable through work clamp as
shown and install onto mounting bolt using
supplied hardware.
1
4
2
3
6
5
8
9
7
Ref. 802 251-A / 802 105-D
PIECE
14 mm
6 mm
Tools Needed: