Hearth and Home Technologies CB1200I-B User Manual
Page 11

R
Septemer 1, 2008
7014-083E
Page 11
CB1200-I Pellet Insert
Mark area of
floor to cut
Starter hole
Keep sharp edge of
metal floor away from
power cord
• The firebrick (refractory), glass doors, screen rails,
screen mesh and log grates can be removed from a
factory-built firebox in order to gain minimum insert
opening requirements.
• Any smoke shelves, shields and baffles may be
removed from a factory-built firebox if attached with
mechanical fasteners.
• The metal floor of the factory-built firebox may be
removed to facilitate the installation of the insert only
when a 1 inch (25mm) airspace is provided between
the insert and the floor of outer wrap.
•
If the floor is made of thin metal, we recommend using
a Quarda-Fire floor protector, Part 811-0730, which is
available through your dealer.
Figure 11.1. Measure and mark the metal
floor for cutting. With a drill, make a starter
hole in each corner.
Figure 11.2. Using a saws-all, cut out the
floor.
Figure 11.3. Place the insert into the fac-
tory-built firebox. Ensure that the power
cord can not be damaged by the sharp metal
edge. You may need to cut out a notch to
accommodate the cord.
H. Removing Metal Floor of Factory-Built
Firebox