Operational checks – Hotpoint EG94 User Manual
Page 30
![background image](/manuals/92280/30/background.png)
30
GB
Operational Checks
After installation, check for gas soundness. The
supply pressure can be checked at one of the
hotplate burner injectors.
Check that the hotplate burners ignite correctly
and burn with a steady flame.
Check for a steady flame at the low setting.
Instruct the user on the operation of the cooker.
See also other documents in the category Hotpoint Radio:
- double oven cookers (36 pages)
- RGB735DEP (2 pages)
- RGB790DEP (2 pages)
- RGB533WEH (2 pages)
- RB525BCCT (2 pages)
- JBS03 (52 pages)
- RB526DPCC (2 pages)
- RGB530 (44 pages)
- RGB790WEK (2 pages)
- LEB316 (32 pages)
- RA720 (24 pages)
- RB790DPWW (2 pages)
- RGB528BEACT (2 pages)
- RF725GP (32 pages)
- RGB540SEHSA (2 pages)
- RGB528BEAAD (2 pages)
- EG54 (32 pages)
- RGB533WEW (2 pages)
- RGB746DEPWW (2 pages)
- RB787WC/BC (2 pages)
- RGB526PEACT (2 pages)
- RB758DPBB (2 pages)
- RGB508PEAAD (2 pages)
- RGA520EW (2 pages)
- RB790SD (2 pages)
- RB540SP (2 pages)
- RB787DPBB (2 pages)
- RGB506 (40 pages)
- WF645 (2 pages)
- WF645 (11 pages)
- RGB528BEAWH (2 pages)
- RGB530DEP (2 pages)
- RGB528PENWW (2 pages)
- RGB845WEC (2 pages)
- RGA524EW (2 pages)
- RGA720 (36 pages)
- H250E (32 pages)
- RGB526PEAAD (2 pages)
- RB536BCCT (2 pages)
- RB526CCC (2 pages)
- RB526CWW (2 pages)
- RGB744 (56 pages)
- EG600X (20 pages)
- wml 520 (16 pages)