beautypg.com

Areas of use, Installation instructions – Harbor Freight Tools PACIFIC HYDROSTAR 1/3 HP Submersible Sump Pump with Vertical Float Switch 68476 User Manual

Page 5

background image

Page 3

For technical questions, please call 1-800-444-3353.

Sump Pump manual

WARNING! If either power cord or plug is damaged,

do not use the pump. The power cord or plug

may only be repaired by a certified electrician.

Areas of use

1. This pump is designed to pump clear water only.

2. This pump is designed for use as a basement pump.

When installed in a shaft, this pump provides

some protection from basement flooding.

3. This pump can also be used to transfer water

(e.g. household, farming, plumbing).

Installation Instructions

1. Construct a basin that is at least 22 IN. deep

and at least 14 IN. in diameter.

Figure A: Sump Basin

at least 14

IN. diameter

at least

22 IN. deep

Sump

Basin

Inlet Pipe

2. Position pump on solid surface so that the Float

Switch is away from the inlet pipe and at least 1 IN.

away from all obstructions throughout its movement.

Figure B: Pump Position

Float

Switch

Pump

Pump

Cord

Sump Cover

Float

Switch

Cord

3. Fit a sump cover with a hole for the output pipe

and power cords. Thread the Power Cords

through their holes, but do not plug them in yet.

Set the sump cover aside for now.

Note: The sump cover can also be

fitted with a vent pipe, if desired.

4. Attach a discharge pipe to the Pump Outlet.

Note: Wrap all threaded connections

with PTFE thread seal tape.

Figure C: Outlet Pipe and Plug

To discharge

(away from foundation)

GFCI-Protected

Receptacle

Pump

Cord

Float

Switch

Cord

Check

Valve

Pump

Outlet

1

/

8

IN.

Air Bleed

Hole

Discharge

Pipe

5. To prevent needless cycling, install a check valve

onto the discharge pipe. This prevents water

from flowing back after the pump shuts off.

6.

IMPORTANT: Drill a

1

/

8

IN. diameter air bleed hole

through the Discharge Pipe just above the lower Base

to prevent Pump “airlock”. A small spray of water

out of this hole is normal while the Pump is running.

7. Install a gate valve or ball valve if

required by building codes.

8. The ON/OFF height can be changed

by adjusting the Float Switch.

9. Connect additional Discharge Pipe as needed

to direct the water discharge at least 3 FT.

away from the foundation. Slope the discharge

pipe downward, away from the foundation.

The discharge should be kept as short as

possible with a minimum number of turns.

IMPORTANT: Do not exceed the

Maximum Delivery Height of the Pump.