Assembly – HONDA HARMONY FG100 User Manual
Page 33

6. Install the grip on the right lower handle. Apply
a small mount of dish soap to the right handle
pipe to ease the installation of the grip.
7. Install the pipe plug into the left lower handle.
8. Secure the left and right lower handles using
the 1/4-20 x 2 inch flange bolt, two curved
washers and a 1/4 inch locking nut.
9. Securely tighten the hardware to complete the
installation of the left and right handles to the
tiller.
Use a torque wrench and finish tightening the
hardware to: 8 ft-lb (10.8 N•m)
10. Install the upper handle to the lower handles
using the two 5/16-18 x 1 1/2 inch curved-head
bolts, two curved washers and the two
handlebar knobs.
Make sure the throttle cable and engine switch
harness are on the outside of the upper and
lower handlebars.
11. Install the grips on the upper handle. Use a
small amount of liquid dish soap on the upper
handle pipe to ease grip installation.
12. Lift the throttle lever towards the handlebar to
expose the slotted hole.
13. Take the cylinder end of the throttle cable and
insert it in the throttle lever slotted hole.
CURVED WASHER
(2)
1/4-20 x 2 inch FLANGE BOLT
1/4 inch LOCKING
NUT
PIPE PLUG
GRIP
RIGHT
LOWER
HANDLE
LEFT LOWER HANDLE
5/16-18 x 1 1/2 in
HANDLEBAR
BOLT (2)
CURVED
WASHER
(2)
HANDLEBAR
KNOB (2)
UPPER HANDLE
GRIP
THROTTLE
CABLE
ENGINE
SWITCH
HARNESS
THROTTLE
CABLE
THROTTLE LEVER
THROTTLE CABLE
CYLINDER
THROTTLE LEVER
SLOTTED HOLE
ASSEMBLY
FG100 TILLER
31