beautypg.com

Service and adjustments – Husqvarna 650CRT User Manual

Page 15

background image

15

SERVICE AND ADJUSTMENTS

CABLE CLIP
SCREW

DRIVE
CONTROL
CABLE

EXTENSION
SPRING

ENGINE
PULLEY

IDLER
PULLEY

TRANS MIS SION PULLEY

LESS
TEN SION

5/8"

MORE
TEN SION

TO REPLACE GROUND DRIVE BELT
(See Fig. 23)

• Remove belt guard (See “TO REMOVE BELT GUARD”

in this section of this manual).

• Remove old belt by slipping off engine pulley fi rst then

remove from transmission pulley.

• Place new belt in groove of transmission pulley and

into engine pulley. BELT MUST BE IN GROOVE ON
TOP OF IDLER PULLEY. NOTE POSITION OF BELT
TO GUIDES.

• Check belt adjustment as described below.
• Replace belt guard.
• Reposition wheel and replace clevis pin and hairpin

clip.

FIG. 23

GROUND DRIVE BELT ADJUSTMENT
(See Fig. 23)

For proper belt tension, the extension spring should
have about 5/8 inch stretch when drive control bar is in
“EN GAGED” position. This tension can be attained as
follows:
• Loosen cable clip screw securing the drive control

cable.

• Slide cable forward for less tension and rearward for

more tension until about 5/8 inch stretch is obtained
while the drive control bar is engaged.

• Tighten cable clip screw securely.