beautypg.com

Throttle linkage and ignition leads – Echo PPT-265S User Manual

Page 12

background image

12

4. Align flexible drive shaft coupler with engine socket and slide

together until locating hole in shaft is visible through locating hole

in engine housing.

5. Install locating screw (B) and tighten clamping bolts (A).

B

A

A

E

F

throttle

lInkaGe

and

IGnItIon

leads

1. Install throttle linkage cable into fan cover clip (A).

2. Close choke and remove air filter cover.

3. Place throttle linkage (B) through adjustment fixture (C) and install

wire end into large carburetor throttle swivel hole (D). Check

throttle for freedom of movement and that wide open throttle / low

idle extremes are adjusted properly. The throttle linkage must be

adjusted by moving the adjustment fixture (C). Consult with your

Echo Dealer for correct adjustment procedure.

4. Connect 2 ignition stop leads (E, F) from throttle cable tubing to 2

ignition leads (E, F) on engine.

CAUTION:

Assure ignition terminals are completely covered by clear plastic

sleeves.

5. Secure ignition leads against engine housing with clip (G).

6. Install air filter and cover.

G

B

C

D

A