Installation procedure – Rose Electronics RackView 20 User Manual
Page 7

Page 7 KVM Rack Drawer 20” WWW.ROSE.COM
Installation Procedure
1.1 Hardware Kit Contents
1. Rail with front and rear bracket x 2
2.
Screws (length = 6mm) x 6
3.
Keys x 2
1.2 Console Installation Steps
1.
Adjust the rail until 2 screws appear. Loose (but don’t release) the two rear screws then adjust the
depth of the rear bracket to fit your cabinet.
See also other documents in the category Rose Electronics Video:
- Orion XTender Rack (58 pages)
- UltraVista SX (16 pages)
- UltraVista Plus (24 pages)
- UltraVista LC II (32 pages)
- UltraVista LC II (40 pages)
- QuadraVista QF (64 pages)
- ViewLink CATx (24 pages)
- CrystalView CAT5 (4 pages)
- QuadraVista II (74 pages)
- CrystalView CAT5 Rack (8 pages)
- CrystalView Mini USB (24 pages)
- CrystalView USB2 (16 pages)
- QuadraVista HDMI (112 pages)
- CrystalView DVI Multi (16 pages)
- CrystalView DVI Mini (32 pages)
- CrystalView Extreme (24 pages)
- CrystalView DVI CATx (28 pages)
- CrystalView EX5 Quad (20 pages)
- CrystalView EX5 HDMI (22 pages)
- CrystalView DVI Micro (6 pages)
- CrystalView DVI Micro DL (6 pages)
- CrystalView DVI Fiber (28 pages)
- CrystalView DVI Quad (42 pages)
- CrystalView DVI Plus (28 pages)
- CrystalView Pro Fiber Rack (36 pages)
- Video Splitter DVI+Audio (4 pages)
- Video Splitter CAT5 (20 pages)
- Video Splitter DVI (16 pages)
- Video Splitter - VGA (20 pages)
- RackView (14 pages)
- RackView Switch (26 pages)
- RackView Widescreen 17 (18 pages)
- RackView Dual Rail (16 pages)
- RackView High Res (17 pages)
- RackView Keyboard (10 pages)
- RackView LCD Monitor (20 pages)
- RackView Panel Mount (20 pages)