Installing the lcd displays, Bezel compensation value calculation, Figure 4. 2 x 2 installation – Rose Electronics UltraVista LC II User Manual
Page 15

9
UltraVista LC II HDMI Installation and Operations Manual
Installing the LCD Displays
Mount the monitors as shown in figure 4. All displays should be identical in
size and resolution capabilities. When mounting the displays, keep the
horizontal and vertical gaps between displays consistent.
1
2
3
4
Figure 4. 2 x 2 Installation
Bezel Compensation Value Calculation
When all the displays have been mounted, measure the bezel width and
height, and the viewable width and height as shown in figure 5. These
values will be entered into the OSD to set the gap compensation which will
produce a smooth transition from one display to the next.