Phase 7 - assembly of marble base (element 6) – MCZ Mondrian User Manual
Page 13

INSTALLATION AND USE MANUAL
Chapter 3
MONDRIAN
page
13
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.8. PHASE 7 - ASSEMBLY OF MARBLE BASE (element 6)
Before proceeding with final assembly of the cladding, it is advisable to pre-assemble it dry.
Set the marble base next to the wall. The top must be flush with the lower profile. Make small adjustments as
necessary using the feet of the fireplace stove. The right side (the side with holes) must be flush with the right
shoulder.
BASE
MARMO
SPALLA
DX
ALLINEATI
A FILO