Phase 5 – preparation of counter-wall – MCZ Mondrian User Manual
Page 11

INSTALLATION AND USE MANUAL
Chapter 3
MONDRIAN
page
11
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.6. PHASE 5 – PREPARATION OF COUNTER-WALL
Prepare the wall for recessed installation using fireproof material (for example, fireproof plasterboard). Provide
an opening of 660X623 mm, 230 mm from the floor (see drawing). It is advisable to add a flat sheet of steel (the
material as the plasterboard uprights) on the inside to fasten the steel frame support (element 5). Align the
sheet with the opening and at a height of 95÷105 cm from the floor (see phase 6).
23
0
623
660
PARETE
A FILO
=
=
Position the wall with the opening aligned with the fireplace stove and flush with sides, lower edge and upper
edge.