Phase 7 – assembly of slate sides (element 7), Phase 8 - assembly of hood support (element 6) – MCZ Klee User Manual
Page 14

INSTALLATION AND USE MANUAL
Chapter 3
KLEE
page
14
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.8. PHASE 7 – ASSEMBLY OF SLATE SIDES (element 7)
Set the slate side on the fire bed so that the 2 pins of element 6 (fire bed) fit perfectly into the holes in element
6.
Each slate side must close and be aligned with the side in black painted steel.
PERNO
PERNO
3.9. PHASE 8 - ASSEMBLY OF HOOD SUPPORT (element 6)
Assemble element 6 (fire bed/ hood support) with element 5 (Klee horizontal upright) using 3 flanged nuts FD
M5 provided.