MCZ Klee User Manual
Page 12

INSTALLATION AND USE MANUAL
Chapter 3
KLEE
page
12
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
Place the recessed installation wall in its final location, about 76 mm from Forma Puro and with the opening
centred on the fireplace stove (see drawing). The position of the unit with respect to the counter-wall must be
precise (differences of just a few millimetres) after Phase 7 (
Assembly of Slate Shoulders).
SEZIONE A-A
48
76
3.7. PHASE 6 - ASSEMBLY OF FIRE BED (element 6)
Assemble element 6 (fire bed/ hood support) with element 5 (Klee horizontal upright) using 3 flanged nuts FD
M5 provided.
PIANO FUOCO
(SUPPORTO CAPPA)
MONTANTE
ORIZZONTALE
KLEE