Phase 4 – preparation of counter-wall – MCZ Klee User Manual
Page 10

INSTALLATION AND USE MANUAL
Chapter 3
KLEE
page
10
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.5. PHASE 4 – PREPARATION OF COUNTER-WALL
Before assembling the Klee cladding, it is necessary to create the load-bearing counter-wall (or wall for recessed
installation of the fireplace stove), with an opening of W=1392 mm and H=1360 mm from the floor for the
version F/Puro115 and W=1172 mm and H=1360 mm for the version F/Puro95.
If made of fireproof plasterboard panels, it is necessary to reinforce the counter-wall with metal uprights placed
flush with the hole, vertical and resting on the floor (see drawing). For greater safety, you can use two U-
shaped uprights per side (for a total of four) inserted one inside the other.
Perforate the uprights at the holes and slots in the Klee vertical upright (as in the drawing). The holes (D=5 mm)
are necessary to fasten the Klee steel frame assembled with elements 4 and 5.
N.B. It is advisable to place the counter-wall in its final position only after fastening the Klee frame
(see Phase 5)
1
360
1392 (1172)
MONTANTE
ACCIAIO
MONTANTE
ACCIAIO
VISTA POSTERIORE
FORI DA
REALIZZARE
IN OPERA
FOR
ARE
MON
TAN
TE
ACC
IAIO
MONTANTE
ACCIAIO
MONTANTE
VERTICALE
KLEE