GENERAL: All furnaces have been fire-tested to check for proper

operation. This includes, main burner flame, pilot flame, fan

operation, fan control, limit control and automatic valve operation.

If the furnace fails to function on initial installation, it is advisable

to re-check the following:

1. 115 volts to the junction box.

2. Inlet gas pressure.

3. The 24 volt system.

4. Type of gas being used and that shown on the rating label.

The Service Department at Empire Comfort Systems, Inc. may

be contacted to assist in servicing furnace or call a qualified

serviceman.
Servicing the Pilot and Main Burners, Pilot Orifice, and Main

Burner Orifices: Disconnect the gas supply at the inlet to the

control valve. Then remove the burner door to which the above

components are attached.
Servicing The Fan Motor: The upper front panel, the shroud

surrounding the fan blade and fan blade must be removed.
Replacing Fan and Oiling the Motor

The fan motor should be cleaned and oiled once each heating season.

To reach the motor, withdraw the metal shroud surrounding the fan

blade by removing the screws on each side. Oil holes are located

on the top at each end of the motor. Use a few drops of #10 motor

oil. To clean the motor, blow air through its ventilation openings

with a vacuum cleaner or low pressure air source.
If fan motor is replaced, the silicone rubber gaskets, see Page 19,

Index No. 4, Part No. 712059, should also be replaced. The gaskets

must be stretched to fit the motor bolts into the gasket holes and then

the motor and gaskets installed on the motor mounting bars.
S8600H INTERMITTENT IGNITION MODULE

SPECIFICATIONS

Lockout timing is 90 seconds. Ignition timing is until pilot lights

or lockout occurs.
Module shuts down and cuts power to gas control on flame failure.

Gas control closes to provide 100 percent lockout on flame failure.

Manual reset required.
ELECTRICAL RATINGS:

Voltage and frequency: 20.5 to 28.5V (24V nom.) 60 Hz.

Current rating: 0.2 A.

Valve contact ratings (at 24 Vac):

Run

Inrush

Pilot 1.0 A

10.0 A

Main 1.0 A

10.0 A

SPARK GENERATOR OUTPUT: 13kV peak at 25 pf load.

THERMOSTAT ANTICIPATOR SETTING: 0.2 A plus pilot valve

rating plus main valve rating.

THERMOSTAT COMPATIBILITY: Standard models compatible

with all open-close switch type 24 Vac thermostats capable of

supplying rated voltage and current to the module.

AMBIENT TEMPERATURE RATING: Minus 40 F to plus 175

F (minus 40 C to plus 79 C).

RELATIVE HUMIDITY RATING: 5 to 90 percent RH at 95 F.

FLAME FAILURE RESPONSE TIME: 0.8 seconds at 1.0 uA

flame current.

FLAME CURRENT: 1 uA, min.
CHECKOUT

Check out the gas control system:

1. At initial installation of the appliance.

2. As part of regular maintenance procedures.

3. As the first step in troubleshooting.

4. Any time work is done on the system.
STEP 1: Perform Visual Inspection.

A. With power off, make sure all wiring connections are clean

and tight.

B. Turn on power to appliance and ignition module.

C. Open manual shutoff valves in the gas line to the appliance.

D. Do gas leak test ahead of gas control if piping has been

disturbed.

GAS LEAK TEST: Paint pipe joints with rich soap and water

solution. Bubbles indicate gas leak. Tighten joints to stop

leak.

STEP 2: Review Normal Operating Sequence and Module

Specifications.

STEP 3: Reset the Module.

A. Turn the thermostat to its lowest setting.

B. Wait one minute.

As you do Steps 4 and 5, watch for points where operation

deviates from normal. Refer to Troubleshooting Chart to

correct problem.

STEP 4: Check Safety Lockout Operation.

A. Turn gas supply off.

B. Set thermostat above room temperature to call for heat.

C. Watch for spark at pilot burner.

D. Time length of spark operation. Maximum spark time is 90

seconds.

E. Open manual gas cock and make sure no gas is flowing to pilot

or main burner.

F. Set thermostat below room temperature and wait one minute

before continuing.

STEP 5: Check Normal Operation.

A. Set thermostat above room temperature to call for heat.

B. Make sure pilot lights smoothly when gas reaches the pilot

burner.

C. Make sure main burner lights smoothly without flashback. Make

sure burner operates smoothly without floating or lifting.

D. If gas line has been disturbed, complete gas leak test.

GAS LEAK TEST: Paint gas control gasket edges and all pipe

connections downstream of gas control, including pilot tubing

connections, with rich soap and water solution. Bubbles indicate

gas leaks. Tighten joints and screws or replace component to

stop gas leak.

E. Turn thermostat below room temperature. Make sure main

burner and pilot flames go out.

OPERATION

Module operation can be conveniently divided into two phases

for S8600H. The phases are trial for ignition and main burner

operation.

SERVICE & MAINTENANCE SUGGESTIONS