beautypg.com

ETA Systems SM5505 User Manual

Page 16

background image

Conditioned Power Center

16

Section 4 - Preparation

Figure D - Shipping Crate Disassembly - 10 to 20 kVA

Figure E—Shipping Crate Disassembly - 25 kVA to 300 kVA

IMPORTANT ! Retain all parts of the shipping container and packaging material until after the CPC series
has been installed and proper operation verified. Once installed and operational integrity is verified, the
packaging material may be discarded.

1. Crate

Top

2. Packing

Block

3. Front

Side

4. Back

Side

5. Right

Side

6. Left

Side

7. Shipping

Pallet/Skid


Shipping crate should be dis-
assembled in the numerical
order shown. Removing pan-
els 1 through 7 will provide
total access to the power con-
ditioner, which is enclosed in
foam wrap and plastic and
banded to shipping skid #7.

1

2

3

4

5

6

7

1

2

3

4

1. Cardboard

outer

carton

2. Shipping

pallet

3. 2 x 4 front cleat
4. Front

skid


After removing the front
cleat and front skid, the
pallet may be rocked for-
ward on the middle skid
and the power conditioner
may be easily rolled off the
pallet and onto the floor.