ETA Systems SM5505 User Manual
Page 16

Conditioned Power Center
16
Section 4 - Preparation
Figure D - Shipping Crate Disassembly - 10 to 20 kVA
Figure E—Shipping Crate Disassembly - 25 kVA to 300 kVA
IMPORTANT ! Retain all parts of the shipping container and packaging material until after the CPC series
has been installed and proper operation verified. Once installed and operational integrity is verified, the
packaging material may be discarded.
1. Crate
Top
2. Packing
Block
3. Front
Side
4. Back
Side
5. Right
Side
6. Left
Side
7. Shipping
Pallet/Skid
Shipping crate should be dis-
assembled in the numerical
order shown. Removing pan-
els 1 through 7 will provide
total access to the power con-
ditioner, which is enclosed in
foam wrap and plastic and
banded to shipping skid #7.
1
2
3
4
5
6
7
1
2
3
4
1. Cardboard
outer
carton
2. Shipping
pallet
3. 2 x 4 front cleat
4. Front
skid
After removing the front
cleat and front skid, the
pallet may be rocked for-
ward on the middle skid
and the power conditioner
may be easily rolled off the
pallet and onto the floor.