Operation, Operational controls and adjustments – Epson 22-681 User Manual
Page 12
12
OPERATIONAL CONTROLS AND ADJUSTMENTS
Fig. 18
A
B
LOCKING SWITCH IN THE “OFF”
POSITION
IMPORTANT: When the machine is not in use, the switch
should be locked in the "OFF" position using a padlock
(C) Fig. 19, with a 3/16" diameter shackle to prevent
unauthorized use.
In the event of a power outage, always lock switch in
“OFF” position until the main power is restored.
Fig. 19
C
OPERATION
STARTING AND STOPPING MACHINE
SINGLE PHASE MACHINE
The on-off push button switch is located on the motor
junction box. To turn the machine “ON” push the start
button (A) Fig. 18, and to turn the machine “OFF” push
the stop button (B).
STARTING AND STOPPING MACHINE
THREE PHASE MACHINE
On the three phase machine the switch is located on
the left front side of the planer head assembly, as
shown in Fig. 19A. To turn the machine “ON” press the
start button (C), and to turn the machine “OFF” press
the stop button (D).
C
D
Fig. 19A
OVERLOAD PROTECTION (Three Phase Machine Only)
The three phase machine is provided with overload protection which will shut off the motor if the planer is overloaded
or if line voltage falls below safe levels. If the motor shuts off due to overloading or low voltage, let the motor cool for
approximately five minutes. The overload block supplied with the machine will automatically reset itself and the
machine can then be started again by pushing the start button. IMPORTANT: If the machine continually shuts off due
to overloading, the cause of overloading must be corrected. If this happens, it is recommended you obtain advice
from a qualified electrician.