Pedestal, Pedestal and leg installation – Enviro ENVIROFIRE 1600 User Manual
Page 5
PEDESTAL AND LEG INSTALLATION
Please read and understand these instructions before installing ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage.
All screws are pre installed on the base of the unit.
PEDESTAL
•
Remove the bricks from the unit
before starting.
•
Loosen the two carriage bolts that
secure the unit to the pallet. Slide the pallet
towards the front to release carriage bolts
from the key holed slots in the unit. Place the
unit on the pallet on its back.
•
Slide the pedestal assembly over the
bolts located on the base of the unit using the
key holed slots provided.
•
Tighten all four bolts ensuring the
pedestal is properly aligned to the edges of
the unit.
•
Ensure that the gasket material is
properly sealed before continuing.
•
Stand the unit on the pedestal and
set the unit in the location ready for
installation.
•
If fresh air supply is being supplied
from the bottom of the unit please install the
cover plate supplied to the rear of the
pedestal covering the 4” inch hole.
LEGS AND ASH PAN
• Place the unit on the pallet on its
back.
• Slide the ash pan assembly over the
bolts using the key holed slots
provided and tighten all four bolts.
• Ensure that the gasket material is
properly sealed before continuing.
• Carefully remove the cast iron legs
from the packaging and secure each
leg with two bolts provided.
• Secure all four legs, push the leg
towards the center of the stove and
align the legs with the outer edges of
the firebox.
• Stand the unit on the legs and set the
unit in the location ready for
installation
5