beautypg.com

Pedestal, Pedestal and leg installation – Enviro ENVIROFIRE 1600 User Manual

Page 5

background image

PEDESTAL AND LEG INSTALLATION


Please read and understand these instructions before installing ash pan and leg option.

Failure to follow these instructions carefully could cause personal injury or property damage.
All screws are pre installed on the base of the unit.

PEDESTAL

Remove the bricks from the unit

before starting.

Loosen the two carriage bolts that

secure the unit to the pallet. Slide the pallet
towards the front to release carriage bolts
from the key holed slots in the unit. Place the
unit on the pallet on its back.

Slide the pedestal assembly over the

bolts located on the base of the unit using the
key holed slots provided.

Tighten all four bolts ensuring the

pedestal is properly aligned to the edges of
the unit.

Ensure that the gasket material is

properly sealed before continuing.

Stand the unit on the pedestal and

set the unit in the location ready for
installation.

If fresh air supply is being supplied

from the bottom of the unit please install the
cover plate supplied to the rear of the
pedestal covering the 4” inch hole.




LEGS AND ASH PAN

• Place the unit on the pallet on its

back.

• Slide the ash pan assembly over the

bolts using the key holed slots
provided and tighten all four bolts.

• Ensure that the gasket material is

properly sealed before continuing.

• Carefully remove the cast iron legs

from the packaging and secure each
leg with two bolts provided.

• Secure all four legs, push the leg

towards the center of the stove and
align the legs with the outer edges of
the firebox.

• Stand the unit on the legs and set the

unit in the location ready for
installation

5

This manual is related to the following products: