beautypg.com

Port gigabit ethernet switch with 4-port poe – Linkskey LKS-SG9P4 User Manual

Page 10

background image

9-port Gigabit Ethernet Switch with 4-port PoE

8

Note:

Select the installation surface carefully. If the surface is not proper, the

reliability of this installation will be compromised

Too high installation position or vibration might cause a fall leading to

switch damage or personal injury

When installation is finished, don't move the switch very often to avoid

surface coating damage

To make it cable more easily, please place the switch bottom up when you

mount it vertically and pay attention to the weight of the installed cables to

avoid a fall

Keep magnets away from objects such as the floppy disk, magnetic card,

computer or computer monitor, which are easy to be magnetized

Wall Mount Installation

Step 1: Drill 2 holes with a diameter of 5mm on the wall. The distance between the

2 holes is 110mm, and the line through them should keep horizontal, as illustrated

in Figure 2-3.

Step 2: Install a drywall anchor inside the board hole; and flush the edge of the

drywall anchor with the wall surface.

Step 3: Fasten the screws into the drywall anchor. Distance between the inside

surface of the screw header and the edge of the drywall anchor should not be less

than 2.5mm, to make sure that the device can be hung on the bolt tightly.

Step 4: Align two wall type holes at the bottom of the device with the screw, and

hang the device on it.

This manual is related to the following products: