Operation steps – Hongdian H3304 4CH Dual SD MDVR User Manual
Page 26

2 -19
Before power on the equipment, please confirm power supply cable is correctly
connected, especially to make sure 12V power output cable not to short cut with metal
case , BNC metal end, GND cable.
Operation steps
Step1
Install antenna
Step2
Check SIM card is installed correctly and SIM card is activated.
Step3 Check SD card to make sure it is installed correctly and the SD card in a good state!
Step4
Connec power cable of H3308/H3304 MDVR, and power on it.
After power on, if Power and Run indicator light is on, it shows the equipment is
working normally.
After power on, if ETH indicator light is on, it shows network connection is normal.
This manual is related to the following products: