5 power supply, 6 working environment, 7 installation check – Hongdian H3304 4CH Dual SD MDVR User Manual
Page 25

2 -18
Ethernet port
RJ45 interface, 10/100 baseT standard, self-adaption.
2.5 Power supply
Pls confirm there is no short cut of the power supply. Positive and negative pole are correctly
connected. Otherwise MDVR may be burn out.
Connect power cable and ignition cable of H3308/H3304 MDVR to stabilized voltage supply
correctly and then switch on the power supply.
2.6 Working environment
Voltage
DC+8~36V
Working temperature
0 ºC ~+65ºC
Store temperature
-40 ºC ~+80ºC
Relative humidity
95% (no condensing)
2.7 Installation check
precondition
Connect all cables correctly
This manual is related to the following products: