2 measurement channels, Measurement channels – SMA SB 6000TL‑US User Manual
Page 25

SMA America, LLC
5 Troubleshooting
User Manual
SB6-11TLUS-BA-eng-BUS121211
25
5.2 Measurement Channels
The measured values of the inverter are shown on the display in the measurement channels. In
addition, you can read out a variety of measurement channels and messages from the inverter using
special communication devices (e.g. Sunny WebBox) or a PC with the relevant software
(e.g. Sunny Explorer).
Measurement channel
Explanation
Balancer
Operating mode set via "Power Balancer" parameter
CO2 saved
Amount of CO
2
saved during the operating time
E-total
Total energy yield
Error
Description of fault
Event-Cnt
Number of events
Fac
Power frequency
Grid Type
Type of power distribution grid to which the inverter is connected
h-on
Total operating hours
h-Total
Total number of operating hours in feed-in operation
I-dif
Residual current
Iac
Line current
Inv.TmpVal
Temperature measured at IGBT module
Ipv
DC input current
Max Vpv
Maximum DC input voltage
Mode
Current operating mode
Pac
Power fed into the power distribution grid
Pcb.Tmp.Val
Temperature measured at printed circuit board
Power On
Total system start-up counter
Riso
Insulation resistance of the PV plant before connecting to the power
distribution grid
Serial Number
Inverter serial number
Vac
Line voltage L1 - L2
Vac L1
Line voltage L1 - N
Vac L2
Line voltage L2 - N
Vpv
DC Input voltage
Vpv Setpoint
MPP tracking DC target voltage