3 block, 4 schedule, 5 format – Grass Valley K2 Edge Smart Playout Center User Manual
Page 10: 6 duration, Block, Schedule, Format, Duration

K2 Edge Smart Playout Center Format Control User Manual - document version: 1.0
- 9
6.2.3 Block
Specify a Block value [see paragraph 2.1.1 for an example].
BlockValue: specify a name to identify the Block.
Click
Save to save, Cancel to discard.
Use Actions to start or end a Block.
6.2.4 Schedule
Build a Decision based on the following criteria:
o Schedule import field
o Compare type: equals, starts with, ends with, contains,
o Value: the value the field is compared with
o Select the case sensitive option if applicable.
Click
Save to save the Decision, Cancel to discard.
6.2.5 Format
Select a Format from the list. The Event will be checked for presence of this Format.
Click
Save to save the Decision, Cancel to discard.
6.2.6 Duration
The Decision is based on the main Asset’s duration.
Select
Greater than / Equals / Smaller than / Smaller than or equals / Greater than or equals.
Specify the main Asset’s duration in hh:mm:ss:ff.