beautypg.com

Pre-delivery checklist – Allmand Brothers Allmand 8.5 10 FT BACKHOE User Manual

Page 40

background image

40

PRE-DELIVERY CHECKLIST

GENERAL INFORMATION

The following is a list of areas that should be inspected by the dealer prior to

delivery of the backhoe to the customer. The customer should check the list and
make sure that the dealer has completed the inspection. Completion of this check
list will help insure that the customer receives the backhoe in complete working
order, ready to install.

PRE-DELIVERY CHECKLIST - CHECK AND ADJUST AS NECESSARY

1. _____

Check the hydraulic system for correct hydraulic fluid level.

2. _____

Check and lubricate backhoe if necessary. See "Lubrication", Sec-
tion H.

3. _____

Visually inspect the backhoe for bent, loose, cracked, damaged or
missing parts. Check for any other irregularities.

4. _____

Remove paint from finished (chrome) surfaces of cylinders and valve
spools.

5. _____

Backhoe control levers function and direction of operation are in
accordance with the control lever decals.

6. _____

Run cylinders through their full cycle to purge any air from the system.

7. _____

Check all hydraulic connections for leaks and all hoses for proper
positioning to reduce chafing and binding.

8. _____

Check backhoe attachment bolts for tightness. Retighten after the
first eight working hours, and after every forty working hour interval
thereafter. See "Bolt Torque", Section O.

9. _____

Make sure decals are not damaged or missing and are in their right
location. See "Decals", Section Q.

10. _____

Complete and return the manufacturers "Warranty Validation Form"
and sign your dealership pre-delivery checklist.

11. _____

Operator to read the E.M.I. Loader/Backhoe safety manual provided
before operating backhoe.

R