Operating instructions – Allmand Brothers Allmand 8.5 10 FT BACKHOE User Manual
Page 18

18
OPERATING INSTRUCTIONS
OPERATING TECHNIQUES
ATTACHMENT TYPE BACKHOES
TRENCHING BETWEEN A BUILDING
AND AN OPEN EXCAVATION (CONTINUED)
Position the unit so the backhoe swing post is over the centerline of the
trench connection. Dig with the backhoe at extreme swing positions, and in as
close to the stabilizers as possible. Pile the soil on the opposite side of the
trenches.
Position the unit forward so the two trenches can be connected. Pile the
spoil on the opposite side of the trench.
G
See also other documents in the category Allmand Brothers Equipment:
- MH1000 IDF (46 pages)
- MLEX20-30KW V (28 pages)
- MLEX20-30KW V (41 pages)
- I HYDRAULIC (26 pages)
- 15-20 V - MLV15-20 HYDRAULIC (26 pages)
- NL6330 (28 pages)
- ML6-8 LD (87 pages)
- ML15-20 LD (121 pages)
- VSERIES HYDRAULIC (26 pages)
- MB 6100 (76 pages)
- 2220/SE (46 pages)
- NL6330 (87 pages)
- MINE SPEC (80 pages)
- NIGHT LITE PRO LD (88 pages)
- NIGHT LITE PRO LD (54 pages)
- NL PRO II (174 pages)
- NIGHT LITE PRO V (51 pages)
- NIGHT LITE PRO V (67 pages)
- NIGHT LITE PRO V (39 pages)
- NIGHT LITE PRO II LD (10 pages)
- NIGHT LITE PRO II V (13 pages)
- PAL (14 pages)
- PAL4000 (34 pages)
- Allmand 7.5 FT BACKHOE (32 pages)
- Allmand 8.5 10 FT BACKHOE (31 pages)
- TLB 408 BACKHOE (93 pages)
- TLB 509A BACKHOE (58 pages)
- TLB 225 (51 pages)
- TLB 225 (108 pages)
- TLB25D (91 pages)
- TLB25K (88 pages)
- TLB6235 Tractor (42 pages)
- TLB6235 Tractor (80 pages)
- TLB35D (99 pages)