Watson-Marlow NBR User Manual
Page 11

10
important, refer to the drawings below for a proper hose
connection. The hose clamp should be installed against
the bracket E (example 1) or at the indicated position on
the bushing G (example 2).
Example 1 Hose connection (EHEDG) with a hose bore > 20mm.
A:
Pump hose
B:
Pump
C:
Detail Z (see detail image on page 12)
D:
Hose clamp
E:
Bracket
F:
Stainless steel insert
G:
Pipe flange
H:
O-ring
WARNING
Only use genuine Bredel parts for a proper
hose connection.
A
B
C D
E
H
G
F