beautypg.com

Watson-Marlow EC 25 User Manual

Page 13

background image

Revision 4.4 / November 2010

13

Watson-Marlow MasoSine

Postfach 100
Steinbeisstraße. 3
D-74358 Ilsfeld (Germany)
Telefone : +49 (0)7062 9560-0
Telefax : +49 (0)7062 64593
EMail : [email protected]
Internet : http://www.masosine.com

15 Oil change

For pumps in the series

EC 25 / EC 40 / EC 60

check every day and in particular every time before starting up, that there

is enough oil in the component bearing block. The oil sight glass in the support must be filled to the middle. Please use the
following oil grade for your specific application! If the pump is to be used in an area that is combustible where ATEX applies, the
oil viewing glass is replaced by a screwed plug.

Standard first filling of Watson-Marlow MasoSine Pumps

• For –10°C to 60°C / 14° F to 140° F

Klüberoil 4 UH 1-220 N (lube oil for the food and pharmaceutical industry)

Oil grades for ex-zones

• Only the following oil type may be used in pumps operated in explosive areas:

Klüberoil 4 UH 1-220 N (lubrication oil for the food and pharmaceuticals industries)

15.1 Filling volumes

EC 25 approx. 0,10 litre / US qt EC 40 approx. 0,15 litre / US qt EC 60 approx. 0,50 litre / US qt

16 Disposal

Send the old oil or old grease for treatment.

17 Spare parts

Basically repairs should be performed only by factory personnel or by customer service agencies authorized by the factory. If
you make repairs yourself, observe the relevant safety regulations and contact the factory customer service before starting the
work, especially if warranty obligations which can be lost by not approved repairs still exist.
Only Watson-Marlow MasoSine spare parts may be used.
You should record changes in the fixtures and fittings, for example another sealing
system or a material change, in writing.

Please provide all data when ordering:
- Pump number

- Description

- Type

- Material

- Item No. - Quantity

Ask for our express delivery!

18 Taking out of service

18.1 Provisional taking out of service

Short term:
Remove product residues (cleaning) Switch off main switch Clean pump surface
Longer term:
Remove product residues carefully (cleaning ) Switch off main switch Clean pump surface

Disconnect connections

Store the scraper in water.

18.2 Final putting out of service

Separate power and purging liquid supply. Send oils and greases for treatment.
If you send us the remaining parts freight paid, we will dispose of the parts.

This manual is related to the following products: