1. Refer to Thermon RGS Installation Procedures, FORM CPD1020, for general installation procedures, requirements and guidelines.
2. Upon receiving heating cable, check the cable to make sure the proper type and output have been received. All cables are
printed on the outer jacket with part number, voltage rating and watt output.
3. Visually inspect cable for any damage incurred during shipment.
The heating cable should be tested to ensure electrical integrity
with at least a 500 Vdc megohmmeter (megger) between the
heating cable bus wires and the heating cable metallic braid.
IEEE 515.1 recommends that the test voltage for polymer
insulated heating cables be 2500 Vdc. Minimum resistance
should be 20 megohms.
(Record 1 on Report Form.)
A. Connect the positive lead of the megger to the cable bus wires.
B. Connect the negative lead of the megger to the metallic braid.
C. Energize the megger and record the reading. Readings between 20 megohms and infinity are acceptable. Readings below
20 megohms may mean the electrical insulation has been damaged. Recheck the heating cable for physical damage between
the braid and the heating element; small cuts or scuffmarks on the outer jacket will not affect the megger reading unless there
was actual penetration through the braid and dielectric insulation jacket.
4. After installation is complete, visually inspect cable for any damage incurred during installation. Recheck the heating cable with at
least a 500 Vdc megohmmeter (megger) between the heating cable bus wires and the heating cable metallic braid. IEEE 515.1
recommends that the test voltage for polymer insulated heating cables be 2500 Vdc. Minimum resistance should be 20 meg-
ohms.
(Record 2 on Report Form.)
5. Once power supply is completed, record the panel and circuit breaker information. Ensure all junction boxes, temperature
controllers, cable glands, etc. are properly secured. Set the temperature controller (if applicable) to the manual setting and apply
rated voltage to the heat tracing circuit(s) for 10 minutes. Record the ambient temperature, measure and record the circuit(s)
voltage and current.
(Record 3 on Report Form.)
NOTE: To ensure the heating cable warranty is maintained through installation, the testing outlined on
this sheet must be completed on the installed heating cables, and the test results recorded and