Fak-4 and fak-4l: in-line splice, Installation procedures – Thermon FAK-4 User Manual
Page 2
![background image](https://www.manualsdir.com/files/807637/content/doc002.png)
FAK-4 and FAK-4L: In-Line Splice Kit . . .
The FAK-4 and FAK-4L: In-Line Splice Kit is designed to make a
waterproof seal over the end of TubeTrace or ThermoTube at the
splice connections. Review FAK-4 and FAK-4L Instructions prior to
installation. Kit will make one splice connection. (Tube fi ttings not
included. See separate instructions for details on splicing heating
cables.)
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
4. Store in dry location.
FAK-4 and FAK-4L: In-Line Splice
INSTALLATION PROCEDURES
Item
Quantity
Description
1
1
In-Line Splice Cover (Top)
2
1
In-Line Splice Cover (Bottom)
3
8/12
Pan-Head S.S. Screws, #10-32 x .75
4
8/12
KEPT S.S. Nuts, #10-32
5
1
Heat Refl ective Tape
6
1
Glass Fiber Tape
7
2
RTV Sealant Tube
3
4
6
5
7
Tools Required . . .
FAK-4 and FAK-4L: In-Line Splice Kit Contents . . .
1
2
1
Installation Precautions . . .
• To minimize the potential for arcing and ground-fault protection.
The National Electrical Code (NEC) and Canadian Electrical Code
(CEC) require ground-fault protection of equipment for each
branch circuit supplying electric heat tracing.
• Installation must comply with Thermon requirements and be
installed in accordance with the NEC, CEC, or any other applicable
national and local codes.
• Component approvals and performance ratings are based on
the use of Thermon specifi ed parts only. User supplied power
connection fi ttings must be listed or certifi ed for intended use.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before and
during installation.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protective equipment, or PPE, should be
utilized during installation. Contact Thermon if you have any
additional questions.
C
A
inch (mm)
B
inch (mm)
C
inch (mm)
FAK-4
11-1/4” (286 mm)
4-5/8” (117 mm)
3-1/4” (83 mm)
FAK-4L
14-5/8” (372 mm)
5-5/8” (143 mm)
4-1/2” (114 mm)
B
A
Dimensions . . .