Installation procedures – Thermon FAK-1 User Manual

Page 3

background image

5.

Inspect ends of tubing cover for snug fi t. Apply
additional RTV sealant where needed.

Cut as Required

Tubing Bundle

FAK-1

Top Cover

4.

Fit tubing bundle to bottom half of cover and install
top half. Screw down fi rmly.

INSTALLATION PROCEDURES

2

Tubing

FAK-1

Bottom Cover

RTV

Sealant

3.

Form a gasket by applying RTV sealant to bottom
half of Bulkhead Entry cover and along radius of
upper half.

FAK-1

Bottom Cover

FAK-1

Top Cover

10-32x .75 Pan

Head Screws

10-32 Kept

Nuts

Heat Trace

(if Included)

8

.

Apply RTV bead to back of FAK-1 fl ange prior to
securing to bulkhead.

RTV Sealant

Drilled hole

for bundle

entry

6.

Drill hole matching bundle diameter into bulkhead.
Mark location for U-Bolt entry and drill 1/4”
(7mm) holes through bulkhead.

Drilled holes

for U-Bolt

entry

7

.

Pre-drill FAK-1 with 3/16” (5mm) holes for
securing FAK-1 to bulkhead.

3/16” holes for

securing FAK-1

to bulkhead

(Field Drilled)

1.

Strip back bundle insulation 38mm (1-1/2”) to
76mm (3”) beyond bus connection heat tracing.
If bus connection indentation is less than 305mm
(12”)-381mm (15”) from end of the heat tracing,
proceed stripping the bundle insulation to the next
indentation.

2.

Trim heat tracing to within 305mm - 381mm (12”
- 15”) of the end of the insulation. If self regulating
heat trace proceed to step 3. For Zone-type heat trace
continue with indentifi cation of bus connection on
step 2a.

2a.

Strip back bundle insulation 38mm (1 1/2”) to
76mm(3”) beyond bus connection heat tracing.
If bus connection indentation is less than 305mm
(12”)-381mm (15”) from end of the heat tracing,
proceed stripping the bundle insulation to the next
indentation.

Tubing

Self-Regulating Heat Tracing

Zone Type Heat Tracing

Tubing

Bus Connection

Indentations

(Zone Heater Only)

Heat Tracing

305mm -381mm

(12” - 15”)

Insulation

305mm -381mm

(12” - 15”)

Insulation

Buss

Connection