beautypg.com

Terminator, Zt-p-wp, Installation procedures – Thermon ZT-P-WP User Manual

Page 3

background image

3

1.

Slide appropriate IEK insulation entry
kit components onto cable. (Order
Separately)

3.

Mount expediter to bracket using M5 x 8
mm screws and M5 lock washers.

8.

Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions. Push excess cable back
through expediter. Tighten cap securely.
Tape cable expansion loop to pipe.

4.

Locate bus connection (HPT and FP only)
as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional
cable for expansion as needed.

7.

Cut off end of cable.

GRW

GRW-G/Tstat

6.

Insert cable into expeditor. Make sure
bus connection (HPT and FP only)
remains outside of expediter.

5.

For HPT and FP cable, exchange grommet
in Terminator with grommet provided in
PETK-3-ZT.

Terminator

TM

ZT-P-WP

INSTALLATION PROCEDURES

2a.

Mounting Method 1: Secure wall mount
bracket to mounting surface using pipe
band provided with kits.

2b.

Mounting Method 2: Secure wall mount
bracket to mounting surface using
customer supplied screws, fl at washers,
and nuts.