Terminator, Zt-p-wp, Installation procedures – Thermon ZT-P-WP User Manual
Page 3

3
1.
Slide appropriate IEK insulation entry 
kit components onto cable. (Order 
Separately)
3.
Mount expediter to bracket using M5 x 8 
mm screws and M5 lock washers.
8.
Terminate cable with appropriate PETK 
termination kit. Refer to PETK installation 
instructions. Push excess cable back 
through expediter. Tighten cap securely. 
Tape cable expansion loop to pipe.
4.
Locate bus connection (HPT and FP only) 
as shown. Cut end of cable at angle to aid 
in piercing grommet. Leave additional 
cable for expansion as needed.
7.
Cut off end of cable.
GRW
GRW-G/Tstat
6.
Insert cable into expeditor. Make sure 
bus connection (HPT and FP only) 
remains outside of expediter.
5.
For HPT and FP cable, exchange grommet 
in Terminator with grommet provided in 
PETK-3-ZT.
Terminator
TM
ZT-P-WP
INSTALLATION PROCEDURES
2a.
Mounting Method 1: Secure wall mount 
bracket to mounting surface using pipe 
band provided with kits.
2b.
Mounting Method 2: Secure wall mount 
bracket to mounting surface using 
customer supplied screws, fl at washers, 
and nuts.
