beautypg.com

Terminator, Zp-wp, Installation procedures – Thermon ZP-WP Terminator User Manual

Page 4: Wiring details

background image

Power Connection (1 to 3 Heating Cables)

Wiring Details

In-Line Splice and T-Splice

End Termination (1 to 2 Heating Cables)

Remove jumpers for 2 cable terminations.

9.

Mount junction box base on expediter.

Make sure to align slots to properly

orient junction box base. Tighten nut

with Terminator-LN-Tool. If mounting

horizontally, threaded gland holes must

face downward.

Terminator

TM

ZP-WP

INSTALLATION PROCEDURES

10.

Remove M25 dust cap. Install M25

power gland (order separately) and M25

blind plug. For in-line splice, T-splice,

or end termination, install additional

M25 blind plug (order M25-B-EXE

separately) instead of M25 power gland.

Specifications and information are subject to change without notice. Form PN50846U-0114

THERMON . . . The Heat Tracing Specialists

®

www.thermon.com

Corporate Headquarters

100 Thermon Dr.

PO Box 609

San Marcos, TX 78667-0609

USA

Phone: +1 512-396-5801

European Headquarters

Boezemweg 25

PO Box 205

2640 AE Pijnacker

The Netherlands

Phone: +31 (0) 15-36 15 370

For the Thermon office nearest you

visit us at . . .

www.thermon.com

11.

Install power cable.

12.

Install terminal block and complete

system wiring. Terminal set screws shall

be tightened to a torque value of 1.4 Nm

(12.4 lb-in). See below for wiring details.

13.

Install junction box lid and twist hand

tight. Insert screwdriver into ratchet

slots located on side of junction box

base. Use screwdriver to ratchet on

junction box lid. Lid will rotate 30

degrees. To remove lid, repeat step 13

but in the opposite direction.

14.

Install IEK insulation entry kit to seal

heating cable penetration through

insulation cladding.