Terminator, Zp-wp, Installation procedures – Thermon ZP-WP Terminator User Manual
Page 4: Wiring details

Power Connection (1 to 3 Heating Cables)
Wiring Details
In-Line Splice and T-Splice
End Termination (1 to 2 Heating Cables)
Remove jumpers for 2 cable terminations.
9.
Mount junction box base on expediter.
Make sure to align slots to properly
orient junction box base. Tighten nut
with Terminator-LN-Tool. If mounting
horizontally, threaded gland holes must
face downward.
Terminator
TM
ZP-WP
INSTALLATION PROCEDURES
10.
Remove M25 dust cap. Install M25
power gland (order separately) and M25
blind plug. For in-line splice, T-splice,
or end termination, install additional
M25 blind plug (order M25-B-EXE
separately) instead of M25 power gland.
Specifications and information are subject to change without notice. Form PN50846U-0114
THERMON . . . The Heat Tracing Specialists
®
www.thermon.com
Corporate Headquarters
100 Thermon Dr.
•
PO Box 609
San Marcos, TX 78667-0609
•
USA
Phone: +1 512-396-5801
European Headquarters
Boezemweg 25
•
PO Box 205
2640 AE Pijnacker
•
The Netherlands
Phone: +31 (0) 15-36 15 370
For the Thermon office nearest you
visit us at . . .
www.thermon.com
11.
Install power cable.
12.
Install terminal block and complete
system wiring. Terminal set screws shall
be tightened to a torque value of 1.4 Nm
(12.4 lb-in). See below for wiring details.
13.
Install junction box lid and twist hand
tight. Insert screwdriver into ratchet
slots located on side of junction box
base. Use screwdriver to ratchet on
junction box lid. Lid will rotate 30
degrees. To remove lid, repeat step 13
but in the opposite direction.
14.
Install IEK insulation entry kit to seal
heating cable penetration through
insulation cladding.