beautypg.com

Terminator, Zp-wp, Installation procedures – Thermon ZP-WP Terminator User Manual

Page 3

background image

1.

Slide appropriate IEK insulation entry kit

components onto cable.

3.

Mount expediter to bracket using M5 x 8

mm screws and M5 lock washers.

7.

Terminate cable with appropriate PETK

termination kit. Refer to PETK installation

instructions.

8.

Push excess cable back through

expediter. Tighten cap securely. Tape

cable expansion loop to pipe.

4.

Locate bus connection (HPT and FP only)

as shown. Cut end of cable at angle to aid

in piercing grommet. Leave additional

cable for expansion as needed.

5.

Insert cable into expediter. Make sure

bus connection (HPT and FP only)

remains outside of expediter.

Note: For HPT and FP cable, exchange

grommet in Terminator with GRW-G

provided in PETK-3.

6.

Cut off end of cable.

3

Terminator

TM

ZP-WP

INSTALLATION PROCEDURES

2a.

Mounting Method 1: Secure wall mount

bracket to mounting surface using pipe

band provided with kits.

2b.

Mounting Method 2: Secure wall mount

bracket to mounting surface using

customer supplied screws, flat washers,

and nuts.

GRW-G

GRW