Terminator, Zp-wp, Installation procedures – Thermon ZP-WP Terminator User Manual
Page 3

1.
Slide appropriate IEK insulation entry kit
components onto cable.
3.
Mount expediter to bracket using M5 x 8
mm screws and M5 lock washers.
7.
Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions.
8.
Push excess cable back through
expediter. Tighten cap securely. Tape
cable expansion loop to pipe.
4.
Locate bus connection (HPT and FP only)
as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional
cable for expansion as needed.
5.
Insert cable into expediter. Make sure
bus connection (HPT and FP only)
remains outside of expediter.
Note: For HPT and FP cable, exchange
grommet in Terminator with GRW-G
provided in PETK-3.
6.
Cut off end of cable.
3
Terminator
TM
ZP-WP
INSTALLATION PROCEDURES
2a.
Mounting Method 1: Secure wall mount
bracket to mounting surface using pipe
band provided with kits.
2b.
Mounting Method 2: Secure wall mount
bracket to mounting surface using
customer supplied screws, flat washers,
and nuts.
GRW-G
GRW