Thermo Technologies Slope Roof User Manual
Page 6

M A Z D O N ‘ 2 ’ T Y P E S Y S T E M
6
(A) With the supplied Stainless steel tube (Key Lever) open the pocket in the
manifold chamber "B" by turning the Key Level "C" through 90
o
. Unpack the
first tube; insert condenser "A" gently through grommet in front of the manifold.
Resting the tube body on the rubber pads of the top and bottom support rails,
slide the condenser "A" into the open pocket. ENSURE BLACK SURFACE
OF ABSORBER FACES UPPERMOST AND TOWARDS THE SOUTH.
(B) Make sure the tube condenser is exactly between the two copper blocks and sits
evenly through hole in manifold chamber.
(C) Repeat stages (A) and (B) for all tubes. Secure tubes by turning the Key Lever to
original position.
16. Replace manifold's lid and secure with self-tapping screws.
17. Make the final inspection on each tube.
18. Set clips over tubes to both top and bottom support rails.
19. Ground manifold installation as per local government regulations and switch pump
control unit to automatic
The manifold flows and return connections are 3/4" copper pipes. Two compression
couplings are included in each manifold system. These couplings are to be used. Manifold
inlet and outlet should not be soldered.