beautypg.com

Thermo Technologies Flat Roof User Manual

Page 5

background image

5

(8) Tighten all nuts and bolts.
(9) Locate manifold in top support rail lip and bolt as shown. Ensure the distance from the
side rails to the manifold ends should be the same as the top support rail.


(10) Locate manifold fittings to manifold inlet and outlet. Note that the air vent should be
installed vertically.
(11) Check all plumbing and piping between collector and hot water storage tank.
(12) Switch on circulating pump.