beautypg.com

Unpack and inspect the equipment, Location requirements, Environmental considerations – Teo UC Pro Server User Manual

Page 11

background image

Installation

13-280137 Rev. C

Page 11

U

U

n

n

p

p

a

a

c

c

k

k

a

a

n

n

d

d

I

I

n

n

s

s

p

p

e

e

c

c

t

t

t

t

h

h

e

e

E

E

q

q

u

u

i

i

p

p

m

m

e

e

n

n

t

t

Check the components for damage that might have occurred during shipment. If any

equipment is damaged, contact the carrier. Verify that the shipment is complete by

comparing the shipped equipment with the shipping list.
The following items are included:

(1) UC Pro Server
(2) Power cords
(2) Brackets for 19" rack mounting
(4) Mounting bracket thumbscrews
(2) Rack inner rails
(2) Rack inner rail extensions
(6) Rack inner rail screws
(2) Rack long (front) outer rails
(2) Rack short (rear) outer rails
(1) Front bezel key
(1) Installation Instructions (this manual)

L

L

o

o

c

c

a

a

t

t

i

i

o

o

n

n

R

R

e

e

q

q

u

u

i

i

r

r

e

e

m

m

e

e

n

n

t

t

s

s

The UC Pro Server installation requires a clean, secure room on the customer premises.

The room must have adequate ventilation and room for front and rear panel access. The

UC Pro Server must be installed per articles 115-15, 110-17 and 110-18 of the National

Electrical Code ANSI/MFPA.
The UC Pro Server must be mounted in a 19" equipment rack.

E

E

n

n

v

v

i

i

r

r

o

o

n

n

m

m

e

e

n

n

t

t

a

a

l

l

C

C

o

o

n

n

s

s

i

i

d

d

e

e

r

r

a

a

t

t

i

i

o

o

n

n

s

s

The UC Pro Server is designed to operate within the following environmental limits:

Operating Temperature: 0° to 40° C (outside the chassis)
Operating Humidity: Up to 95% (non-condensing)