beautypg.com

Installation – Desa VFRMV18PB User Manual

Page 14

background image

www.desatech.com

116412-01B

14

INSTALLATION

Continued

We recommend that you install a sediment trap in

supply line as shown in Figure 14. Locate sediment

trap where it is within reach for cleaning. Install

in piping system between fuel supply and heater.

Locate sediment trap where trapped matter is not

likely to freeze. A sediment trap traps moisture and

contaminants. This keeps them from going into

heater controls. If sediment trap is not installed or

is installed wrong, heater may not run properly.

CAUTION: Avoid damage to

gas control. Hold gas control

with wrench when connecting it

to gas piping and/or fittings.

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an

open flame to check for a leak.

Apply a noncorrosive leak detec-

tion fluid to all joints. Bubbles

forming show a leak. Correct all

leaks at once.

CAUTION: Make sure ex-

ternal regulator has been in-

stalled between propane/LP

supply and heater. See guide-

lines under Connecting to Gas

Supply, page 13.

PRESSURE TESTING GAS SUPPLY

* Purchase the optional CSA design-certified equipment shutoff valve from your

dealer. See Accessories, page 26.

**Minimum inlet pressure for purpose of input adjustment.

Figure 14 - Gas Connection (Remote-Ready Models Only)

To Gas
Control
Valve

3" Minimum

Sediment Trap

Propane/LP - From
External Regulator
(11" W.C.** To 14"
W.C. Pressure)
Natural - From Gas
Meter (5" W.C.**
To 10.5" W.C.
Pressure)

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved Flexible Gas Hose
(if allowed by local codes)

Tee

Pipe

Cap

Joint Nipple

CAUTION: Use only new,

black iron or steel pipe. Inter-

nally-tinned copper tubing may

be used in certain areas. Check

your local codes. Use pipe of

1/2" diameter or greater to allow

proper gas volume to heater. If

pipe is too small, undue loss of

volume will occur.

Installation must include an equipment shutoff

valve, union and plugged 1/8" NPT tap. Locate NPT

tap within reach for test gauge hook up. NPT tap

must be upstream from heater (see Figure 14).
IMPORTANT:

Install equipment shutoff valve in

an accessible location within 6 feet of the appli-

ance. The equipment shutoff valve is for turning

on or shutting off the gas to the appliance.

Apply pipe joint sealant lightly to male NPT

threads. This will prevent excess sealant from

going into pipe. Excess sealant in pipe could result

in clogged heater valves.

WARNING: Use pipe joint

sealant that is resistant to liquid

petroleum (LP) gas.