Spare parts, Documentation requirements, Shipping and delivery – Southern States CSV User Manual
Page 8

Title: Southern States
– CSV
Vertical Interrupter Style Circuit Switcher
Product Specification Guide
Page 8 of 9
Publication No.: PSG-806-CSV 06012011
6.04.02 Interrupter Dielectric Test
Each interrupter shall pass a power frequency withstand test at 60 Hz for
one minute. The required test value shall be at least three times rated
line-to-ground voltage.
7.0 SPARE PARTS
No spare parts shall be required to be purchased at the time of circuit switcher
purchase. Stock shall be maintained at the manufacturer available for rush shipment in
the event of an emergency need.
8.0 DOCUMENTATION REQUIREMENTS
8.01 Approval Drawings
The manufacturer shall furnish approval drawings in AutoCAD .DWG format via
e-mail. The purchase order will designate the name and e-mail address of the
individual where the drawings should be forwarded. If there are no comments to
the approval drawings purchaser will respond via e-mail that drawings are
approved as submitted with no changes. If comments are required then one
copy of the drawings will be returned to the manufacturer within 10 days from the
date of transmittal marked “approved with comments as noted”.
8.02 Final Drawings
The manufacturer shall furnish final drawings in AutoCAD .DWG format via e-
mail. Unless otherwise specified in the purchase order, the final drawings will be
forwarded to the same individual that the approval drawings were sent to.
8.03 Instruction Books
The manufacturer shall furnish an electronic copy of each applicable instruction
book in Adobe Acrobat .PDF format via e-mail. Unless otherwise specified in the
purchase order, the instruction book(s) will be forwarded to the same individual
that the approval drawings were sent to.
8.04 Additional Documentation
One complete set of final drawings and one copy of each applicable instruction
book shall be shipped in a weatherproof envelope with each circuit switcher.
9.0 SHIPPING and DELIVERY
The circuit switcher shall be match-marked and disassembled as necessary to
accommodate shipping dimensional clearance restrictions. Each interrupter shall be
shipped with a positive pressure of 5
–10 psi of SF
6
, eliminating the need to pull a
vacuum on the interrupters in the field. An SF
6
fill kit shall be provided to fill the
interrupters to rated pressure during installation.