beautypg.com

Storage – Smithco TCV 2200 Turf Truck (sn DT2200 – DT2212) Operator Manual User Manual

Page 15

background image

13

Service

STORAGE

UP TO ONE MONTH

1. While engine is running, treat upper cylinders by spraying engine fogging agent into the air intake (NOT

through air cleaner) for about two minutes. Fogging agent can be obtained from your local after market
supplier. Open throttle for short burst of speed, shut off ignition and allow engine to come to a stop while
continuing to spray fogging agent into air intake.

2. Leave spark plugs in holes or seal spark plug holes with suitable threaded metal plugs and cover all

openings into engine with suitable non-hygroscopic material.

3. Store machine indoors in dry area.

TWO MONTHS
(all of the above plus)

4. Clean the exterior surfaces of the engine.

5. Change the oil and filter while the engine is still warm from operation.

6. Remove battery from the engine, adjust the electrolyte level, and recharge it. Store battery in a dry dark

place (NOT directly on cement).

EXTENDED STORAGE
(all of the above plus)

7. Check for any damaged parts or missing decals. Replace as needed.

8. Drain crankcase completely and refill with recommended engine oil or equivalent.

9. Run engine until completely out of gasoline, then restart and run on stabilizer mixed with unleaded

gasoline for at least 10 minutes.

10. Lubricate all grease points.

11. Seal all openings in engine and accessories with non-hygroscopic material. Mask off all areas to be used

for electrical contact.

12. Tape all openings and make sure all surfaces are dry. Then spray all taped openings, all engine accesso-

ries including ignition wiring, and all exterior surfaces of engine with Insulation Compound.

13. Put blocks or stands under the machine to take weight off tires.

AFTER STORAGE

1. Check for any damaged parts or missing decals. Replace as needed.

2. Lubricate all grease points.

3. Clean exterior surface of engine.

4. Replace spark plugs if previously removed.

5. Remove all tape and obstructions from exterior engine surfaces.

6. Charge and replace battery.

7. Check tire pressure.

8. Remove blocks or supports from under the machine.

9. Check engine oil level and coolant level and lubricate all grease points.

10. Fill fuel tank.

11. Check belt tension.

12. Run engine approximately 5 minutes before putting the engine under load.

This manual is related to the following products: