Dometic VN 780 User Manual
Page 4
![background image](/manuals/78603/4/background.png)
english
volvo l-5 a/c - air distribution system
The instructions that follow represent years of development of parts and procedures
that make the system perform well and appear “factory-installed.”
intRoduction
installing the contRol
Mount the control in a place that provides the driver
convenient access. An ideal location would be near
the current HVAC controls.
Required tools
• Drill motor
• Hole saws: 1-5/8", 1-7/8", 2-1/2", 3.5" (for 10K unit)
and 4"
• Drill bits: 1/8", 5/32", 9/32"
• Nut drivers: 1/4", 3/8", 15/16"
• Phillips head screwdriver
• Open-end wrenches: (2) 7/16", (1 each) 5/16", 13/16"
& 3/4"
• Torque wrench may be also be required
Figure 1. Typical Control Installation
installing the Qt digital display
Refer to the mounting instructions and template
provided with your kit.
• Route the CXP cable through the wall and into the
luggage compartment. Remove the factory HVAC
control panel to do this.
• Route the CXP cable to the rear of the bunk for later
connection.