NOTICE!
Carry out the installation such that the safety
assembly is located above the level of the heat
generator.
A
B
G
D
E
F
C
H
I
Fig. 2: Installation schematic
A:
Outdoor unit
B:
WKF series indoor unit
C:
Safety assembly
D:
Cold water
E:
Circulation
F:
Hot water
G:
Floor heating cycle
H:
Supply line
I:
Return line
5
Commissioning
With the initial commissioning of the heating
system, the heat pump is filled until the static pres-
sure of the system is reached. The heat pump is
now brought to the max. heating temperature
whereby care should be taken to ensure that the
pressure increase does not exceed 2 bar. If this
does however exceed 2 bar then the expansion
vessel has been incorrectly selected.
The trigger pressure and rating of the diaphragm
safety valve can be found on the safety placard on
the red hand knob.