Pdg-2520 operating manual quick start guide – Directed Electronics PDG-2515/2520 User Manual
Page 25
PDG-2515/2520 Operating Manual
Page 18
MNPDG2515-2520R0.doc
© 2004 Directed Energy, Inc.
PDG-2520 Operating Manual
Quick Start Guide
This quick-start guide provides a step-by-step guide to manually operating the
PDG-2520. Please refer to the appropriate sections of the manual for additional
instructions and guidelines. The SAFETY warnings in the manual must be read
and understood prior to operating the PDG-2520.
What’s In The Box?
1ea. PDG-2520 Digital Delay & Pulse Generator
1ea. Power Cord
2ea. 50 Ohm Coaxial Output Cable
1ea. Operating Manual
Unpacking
Carefully remove each component listed above. Your PDG-2520 and
accessories were inspected at the factory prior to shipment. Inspect the PDG-
2520, power cord and output cables for signs of shipping damage. If any damage
is noted contact the factory prior to operating the equipment.
Setup
Connect OUTputs to an appropriate load using 50 Ohm coaxial cable (included).
Plug the AC power cord into the rear power entry module of the PDG-2520, and
into an appropriate AC socket.
Power Up
Turn on the PDG-2520 by pressing the power button located above the power
entry module in the rear of the unit.
The front panel display will read initialize and display the software and hardware
versions internal to the unit on the front panel. After a few moments the unit will
finish initialization and the first screen/menu that will appear is the menu for
CHANNEL 1. Note: The buttons and encoder on the front panel will have no
effect as the unit comes up from initialization.
Front Panel Controls & Connections
Encoder
This is for varying the parameters such as Frequency, Pulse Width, Delay,
Trigger Source, etc.