Nortec Steam Distributors User Manual
Page 9
Steam Distributors Installation Manual | 6
Figure 5: Long Steam Run
GO TO
C2
- 45º
2
+ 45º
1
1 turn
3
B
Always align distributor holes so that steam is
discharged upwards to ensure condensate will
remain in the distributor.
Figure 6: Vertical Airflow
1 ft (30 cm)
min before turn
Condensate
tee every
15-20 ft
(4.5 - 6 m)
Condensate
tee at low
points
Individually trap multiple condensate
returns before joining on common line.
To Drain
Install condensate tee
before distributor
Method for Longer Runs With Limited Vertical Space
1 ft (30 cm)
min.
See also other documents in the category Nortec Equipment:
- HumDigital (28 pages)
- NHDI Nortec OnLine (16 pages)
- SynPur (37 pages)
- Steam Distribution (15 pages)
- DRAABE Pure Water System (59 pages)
- AIRFOG Series (48 pages)
- NHDI Resistive Element (40 pages)
- LiveSteam v.1 (38 pages)
- OnLine NHRS (24 pages)
- SAM-e (62 pages)
- HP Series (76 pages)
- LINKS 2 SETC (50 pages)
- Outdoor Temperature Sensor (2 pages)
- Off Digital Wall Humidistat (4 pages)
- LINKS 2 SC (44 pages)
- Off Digital Duct Humidistat (4 pages)
- BLOWER PACK For RH Series (6 pages)
- Outdoor Mount Temperature Sensor (2 pages)
- SETC Outdoor (32 pages)
- Off Digital Wall & Duct Humidistat (6 pages)
- 2-10 V Wall & Duct Humidity Sensor (6 pages)
- SE Series (100 pages)
- MES2 (54 pages)
- LINKS XPS SETC (68 pages)
- LINKS 2 GSTC B+ (23 pages)
- Modbus (52 pages)
- RH2+ (62 pages)
- Blower Packs (31 pages)
- LONWORKS (36 pages)
- Remote Interface (34 pages)
- NH-EL Series (99 pages)
- ME Direct Feed (40 pages)
- ME Control (76 pages)
- MLP RO pump station (12 pages)
- ME Control Installation (48 pages)
- Air Humidification System BS (30 pages)
- ME Direct Feed Installation (48 pages)