Receiving and unpacking – Nortec SETC Outdoor User Manual
Page 5
Introduction | 2
Receiving and Unpacking
1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.
Nortec assumes no responsibility for any material shortages beyond this period.
3 Inspect shipment for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or
loss claims are to be made directly to the shipping company.
Before Installation
1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2 If steam supply is from a Medium or High Pressure boiler ensure supply steam line includes
a relief valve to prevent supply pressure from exceeding 15 psig.
3 Ensure means for returning boiler steam condensate to boiler at atmospheric pressure are
available.
4 Ensure sufficient clearances will be available as described in Location 9.
5 Ensure steam lines can be routed to distributor, SAM-e manifold, or blower pack as
described in Steam Lines and Condensate Returns on page 15.
6 Report any discrepancy immediately to the site engineer.
Figure 1: SETC Outdoor Specification Label Location
Note: A steam valve, actuator, and wye strainer are shipped along with the SETC/P
humidifier but in separate small boxes.