Step 9, Step 10, Installation instructions – DCS DS224 User Manual
Page 11
On the chosen groove cut down the vertical ribs at the centre and
the ends using a knife. Cut along full length with a knife. Turn Toe
Kick over, bend and then cut from front. Sand or scrape bottom edge
to remove rough patches.
Important!
Before cutting ensure the Toe Kick is positioned on a wooden
chopping board to avoid damage to surrounding area.
WARNING!
Remove all sharp edges
To avoid a cutting hazard remove all sharp edges after trimming.
Remove Toe Kick tabs by snapping them off.
Partially open the bottom drawer. Turn Prefinished Toe Kick
upside down and hold vertically against the bottom edge of the
Tub side (not the drawer front).
Mark the position of the bottom edge of the Tub side on the Toe Kick.
Choose the nearest groove to the pencil mark which will result
in the shortest Toe Kick.
Bottom edge
of tub side
R
INSTALLATION INSTRUCTIONS
STEP 9:
MEASURING THE TOE KICK
(DOUBLE MODELS ONLY)
21
22
21
24
22
23
STEP 10:
TRIMMING THE TOE KICK
(DOUBLE MODELS ONLY)
23
24
11