beautypg.com

Installation, Figure 2 installation wiring, load manager p – Kussmaul Electronics 091-141 User Manual

Page 4

background image

INSTALLATION


WIRING:

Figure 2 illustrates the wiring of the Load Manager P. Wire the unit using the
wire gauges shown in figure 2.


ALIGNMENT:

Refer to Figure 3 for all component locations and measurement points.


12VDC Operation:
R102 is normally set maximum counter-clockwise for an 11.0 volt threshold.
R102 can be adjusted in a clockwise direction to obtain a higher threshold
voltage. Maximum clockwise is 12.85 volts.

24VDC Operation:
R102 is normally set approximately 70% of full counter-clockwise for a 22.0 volt
threshold. R102 can be adjusted in a clockwise direction to obtain a higher
threshold voltage. Maximum clockwise is 24.75 volts, maximum counter-
clockwise is 21.25VDC.

R103 is normally set maximum counter-clockwise for a 1-hour time threshold.
R103 can be adjusted in a clockwise direction to obtain a longer time threshold.
Maximum clockwise is 2 hours.

C

NO

1

2

3

4

RADIO &

COMPUTER

LOADS

+

-

FROM
12 or 24
VOLT
BATTERY

SIZE FUSE
FOR 25% HIGHER
THAN ACTUAL
LOAD

FROM
STARTER
SWITCH
(0PTIONAL)

#20 AWG, BLACK

#20 AWG,
YELLOW

#20 AWG, RED

#12 AWG, RED

#12 AWG, ORANGE

#12 A

W
G

, B

L

A

C

K

Figure 2

INSTALLATION WIRING, LOAD MANAGER P