Pin connector, Cautions for adjustment and repair, Caution for servicing – Daewoo L510B1 User Manual
Page 10
8
Arrangement of 15-pin D-sub connector
Pin Signal
1 Red
2 Green
3 Blue
4
GND
5
GND
6
GND - Red
7
GND - Green
8
GND - Blue
9
+
5Vdc
10
GND - H.Sync
11
GND - V.Sync
12
Bi-directional Data (SDA)
13
Horizontal Sync
14
Vertical Sync (VCLK)
15
Data Clock (SCL)
1
6
10
15
PIN CONNECTOR
• Degaussing is always required when adjusting purity or convergence.
• The white balance adjustment has been done by a color analyzer in factroy. The adjustment procedure,
described in the service manual is made by a visual check.
• Allow 20 minutes warm-up time for the display before checking or adjusting only electrical
specification or function.
• Reform the leadwire after any repair work.
◆ Caution For Servicing
• In case of servicing or replacing inverter, high voltage sometimes remains in the output of the inverter.
Completely discharge high voltage before servicing or replacing inverter to prevent a shock to the
serviceman.
CAUTIONS FOR ADJUSTMENT AND REPAIR