beautypg.com

5 preparing for operation – Kemppi KempCool 10 User Manual

Page 7

background image

EN

2.4.2 main parts of cooling unit

E
F

G

H

A

B

C

D

TEST

Front machine

A. Housing

B. Test switch

C. Overheat control lamp

D. Filling hole

back side

E. Mains voltage connection cable

F. Control cable

G. Cooling water output hose

H. Cooling water input hose

2.5

preparing FOr OperatiOn

NOTE!

Cooling liquid is injurious! Avoid also contact with skin or eyes. In case of

injury, seek for medical advice.
See also 2.4.2. Main parts of cooling unit.

1. Connect the mains voltage and control connectors of the cooler unit

to the corresponding connectors on the base of the power supply.

The connection can be established through the base of the power

supply when the devices are separated or through the right side of the

KempCool 10 cooler by removing the right side plate.

2. Attach the power supply on the KempCool 10 cooler.

5

KempC

ool 10 / © Kemppi O

y / 1038