Dometic 3200 Series User Manual
Page 5

5
STEP 9:
WITh The eLecTRIcAL PoWeR off, route
#14 gauge stranded copper wire from 12 VDC ground
and positive 2 VDC from the fuse panel through a 2-amp
fuse or circuit breaker. Leave at least 2 inches (305 mm)
of wire for connecting to toilet (fig. 9).
STEP 0: Connect the holding tank to the bottom of the
discharge flange.
STEP 11: Slide the four T-bolts into the slots of the floor
flange. Install the flange gasket over the T-bolts (fig.
0).
fig. 9
fig. 10
STEP 12: Install floor flange adapter with words “THIS SIDE
UP” facing up. Tighten adapter to floor flange using four
flat washers and hex nuts. Tighten in criss-cross pattern
(fig. 11).
STEP 13: Temporarily set the toilet in place on the floor
flange (fig. 14).
STEP 4: Mark the holes for the two toilet mounting
bolts (fig. 15).
fig. 16
STEP 5: Pick up toilet and set aside. Drill 3/6-inch
pilot holes in the floor (fig. 16).
fig. 15
STEP 16: With toilet close to floor flange, connect flex-
ible water supply hose to the water line fitting (fig. 17).
fig. 11
fig. 17
IMPoRTANT: If replacing an existing toilet with 2-bolt
floor flange, drill two 5/16-inch dia. holes in old floor
flange that align with two additional holes in floor
flange adapter. Use two #10 or 12 x 1-1/2-inch wood
screws and washers for these drilled holes, and two
T-bolts with flat washers and nuts to fasten flange
gasket and floor flange adapter to old floor flange.
do not use old hardware or seal.
fig. 14