Dometic 3200 Series User Manual
Page 4

4
STEP 5a: For through-the-floor water line and electrical
wires, mark another centerline 6 inches (52 mm) from
the back wall (fig. 4).
STEP 5b: For through-the-wall water line and electrical
wires, mark a centerline 8 inches (203 mm) up from the
floor centerline (fig. 5).
STEP 6: Make a 4-3/4 inch (2 mm) diameter hole (for
most floor flanges) or a 5-1/8 inch (130 mm) diameter
hole (for swivel joint floor flange) at the centerline mark
furthest from the wall. Make a inch (25 mm) hole at the
mark closer to the wall for the water line and electrical
wires (fig. 6).
STEP 7: Insert floor flange into larger hole and secure
to the floor with #12x3/4-inch long flat head wood or
sheet metal screws (fig.7).
fig. 5
fig. 6
fig. 4
IMPoRTANT: The prefered installation method is to
mount the floor fIange directly on the finished floor.
However, if the bottom of floor flange and bottom of
china toilet must be mounted at different heights,
the floor flange must be mounted within 3/8 inch (10
mm) of the bottom of the toilet (see illustrations in
next column) or leakage will result.
below-floor Installation
STEP 8: Route /2-inch (3mm) PEX tubing through
the smaller hole and install a PEX 1/2-inch MPT fitting
(fig. 8).
NoTe: A water shut-off valve should be installed in the
water line to the toilet for maintenance requirements.
fig. 7
Above-floor Installation
Fig. 8