STEP 5a: For through-the-floor water line and electrical

wires, mark another centerline 6 inches (52 mm) from

the back wall (fig. 4).

STEP 5b: For through-the-wall water line and electrical

wires, mark a centerline 8 inches (203 mm) up from the

floor centerline (fig. 5).

STEP 6: Make a 4-3/4 inch (2 mm) diameter hole (for

most floor flanges) or a 5-1/8 inch (130 mm) diameter

hole (for swivel joint floor flange) at the centerline mark

furthest from the wall. Make a inch (25 mm) hole at the

mark closer to the wall for the water line and electrical

wires (fig. 6).

STEP 7: Insert floor flange into larger hole and secure

to the floor with #12x3/4-inch long flat head wood or

sheet metal screws (fig.7).

fig. 5

fig. 6

fig. 4

IMPoRTANT: The prefered installation method is to

mount the floor fIange directly on the finished floor.

However, if the bottom of floor flange and bottom of

china toilet must be mounted at different heights,

the floor flange must be mounted within 3/8 inch (10

mm) of the bottom of the toilet (see illustrations in

next column) or leakage will result.

below-floor Installation

STEP 8: Route /2-inch (3mm) PEX tubing through

the smaller hole and install a PEX 1/2-inch MPT fitting

(fig. 8).
NoTe: A water shut-off valve should be installed in the

water line to the toilet for maintenance requirements.

fig. 7